QUESTION 1

Select the correct answer;

  1. Verifying “what” the product does is part of functional testing.
  2. Usability Testing is a domain/functional testing technique.
  • Inspection, evaluation and reviews are usability test techniques.
  1. Understandability, learnability and attractiveness are attributes of usability
  2. I, II, III true, IV false
  3. II, III, IV true. I false
  4. I, II true. III, IV false
  5. All of the above true

QUESTION  2

According to the ISTQB syllabus, domain testing quality attributes are;

  1. Accuracy, Suitability, Interoperability
  2. Reliability, Maintainability, Portability
  • Performance, load, Adaptability
  1. All of the above
  2. None of the above
  3. I and II true. III false
  4. I true. II, III false

QUESTION 3

Select the correct statement(s). According to the ISTQB Syllabus;

  1. Unauthorized access & copying, buffer overflow, logic bombs are part of Technical Security Testing.
  2. Fallback, backup and restore activities are part of recoverability testing.
  • Verifying whether a system can handle peak loads at or above maximum capacity is called stress testing.
  1. Verifying whether a system can “meet future efficiency requirements” is called scalability testing
  2. I, II and III true. IV false
  3. I, IV true. II, III false
  4. II, III true. I, IV false
  5. All of the above are true

QUESTION 4

A Software Test Analyst at ABC company. received a new software release and the installation guide from Development. He followed the installation guide and successfully installed the software. Then he followed the fallback instructions and performed a successful fallback. After verifying that the software has completely fallen back as desired, he re-installed the software. What type of testing activity did he do?

  1. Portability testing
  2. Efficiency testing
  3. Reliability testing
  4. Usability Testing

QUESTION 5

Which of the following statements are correct? I. IEEE 1028 is an international standard on reviews. II. Early reviews are very cost effective in finding defects. III. Review is considered a static testing IV. Most documents can be reviewed (source code, requirements document, test plan document)

  1. I, II and III true
  2. I, III and IV true
  3. I, II, III and IV true
  4. II, III and IV true

QUESTION 6

You are a test analyst for XYZ Company. CEO of XYZ sent a meeting entry to you and your manager for a past project evidence and test deliverables review. A person from an external company would like to interview you regarding the previous project. This activity has a very high visibility from upper management. What type of review is described above?

  1. Management Review
  2. Technical Review
  3. Audit
  4. Inspection

QUESTION 7

What type of a review meeting is described below? “You were invited to attend a meeting next week. Meeting moderator included set of metrics and a document to be reviewed along with the meeting agenda. One of the meeting agendas is to find defects in the document sent. You and the other attendees were asked to review the document prior to the meeting”.

  1. Informal Review
  2. Inspection
  3. Walkthrough
  4. None of the above

QUESTION 8

Select the matching pair;

I. Contractual Review

II. Requirement Review

III. Design Review

a. Involve Managers, customers and technical staff. Review contract milestones.

b. Involve customers and technical staff. Review design solutions, test cases.

c. Involve auditor. Review compliance to processes and regulations.

d. Involve customers and technical staff. Reviewing functional and non functional requirements, test conditions.

  1. I-a,II-d,III-b
  2. I-c,II-b,III-a
  3. I-a,II-b,III-c
  4. I-b,II-c,III-d

QUESTION 9

Select the correct pair

I. “Unexpected occurrence that requires a further investigation

II. “Recognition of failure caused by a defect”

III. Requires a change to the work item a) Incident b) Defect c) Bug d) Failure

  1. I-a,II-a,III-b
  2. I-a,II-d,III-b
  3. I-b,II-c,III-d
  4. I-c,II-d,III-b

QUESTION 10

Which of the following statements are correct?

I. A failure can be detected only by dynamic testing technique.

II. Defects can exist in test environment.

III. All incidents require a software change. IV. Code and design reviews can reveal defects

  1. I, II, III true
  2. I, II, IV true
  3. II, III, IV true
  4. II, IV true

QUESTION 11

IEEE 10440-1993 specifies a standard for defect reporting. Which of the following attributes should be in a defect report as per ISTQB Syllabus?

  1. Complete, concise, accurate and objective report.
  2. Compete and accurate. Does not have to be concise or objective.
  3. Complete and objective. Does not have to be accurate.
  4. Accurate. Does not have to be complete, concise or objective.

QUESTION 12

A Junior software tester at ABC Inc. found a defect while testing release 2 of the eForm application. The eForm application does not accept more than 5 characters for its’ “Last Name” field. Tester created a defect report. The defect report contains following information; “eForm application does not accept more than 5 characters for its’ “Last Name” field” Select the correct statement regarding the defect report;

  1. Defect report is complete, accurate and concise.
  2. Defect report is accurate but not complete.
  3. Defect report is complete but not accurate.
  4. Defect report is complete but not concise.

QUESTION 13

A major bank has recently outsourced all of its software development in an effort to reduce its fixed costs. The new supplier will be responsible for all new developments as well as enhancements to existing ones. The bank has retained its own management team for its projects. There will be an in-house project manager, development manager and test manager for each project. Some staff may work on more than one project, depending on the overall size. An enhancement is being made to allow existing customers to authorise their own loans online, from £1k to £10k by answering a series of questions. You are a test manager with the bank and you have written a test strategy for the outsourced team to follow. Unit testing has begun but informal conversations with the developers have revealed that they have not received a signedoff specification from the bank for the enhancement. They do know how loans work though and have created code from conversations with bank staff alongside their own knowledge. How could a strategy have helped to avoid this situation?

  1. The test strategy would have identified bank staff with the right knowledge for consultation on the loan requirements.
  2. The test strategy would have laid out the process for capturing how the loan process would work which the outsourced team would have followed.
  3. The test strategy would have specified that a signed-off specification would be made available to the coding team prior to the start of development.
  4. The test strategy would have requested that the outsourced team take part in specifying the requirements, to make use of their knowledge.

QUESTION 14

The aircrew of a national air defence force has requested changes to the existing aviation software that provides on-board information about the combat environment. The air force is currently engaged in a peace-keeping mission in another country and has come under unexpected threats. The development life cycle is the V model. The software house needs to change their test management process to ensure delivery at the right time and quality. The software changes are coming in as the aircrew request them, as a result of their engagements with hostile forces. The aircrew have requested that the changes are made as quickly as possible. The project manager has decided to revisit the test management process. The changes will come as small change requests. The team have worked on the project for over 25 years, with little staff turnover. Which of the following test measures should be emphasised during the crisis?

I. Readiness of the test environment for each run.

II. Number of high-priority defects being found.

III. Number of defects being found per tester.

  1. Number of hours overtime being worked by staff. V. Number of change requests tested versus number passed.
  2. I, II and V
  3. II, III and IV
  4. II, III and V
  5. I, II and III

QUESTION: 15

Which of the following is NOT a true statement?

  1. Cost benefit analysis should be done before purchasing test tools and analysis should show a good potential return on investment.
  2. Bid bang approach is the best way to rollout test tools to an organization.
  3. Maintenance fees, support fees, licensing fees and learning curve should be considered before introducing test tools to an organization.
  4. Scripted / automated tests can be executed faster during test execution phase.

QUESTION 16

Which of the following statements are true about risks of introducing test automation tools?

I. Poorly designed test cases automated “as is” results in execution errors.

II. Reduce defect detection due to limited manual testing by a tester.

III. Too many dependencies to integrate test tools and test tool limitations.

  1. Unrealistic expectations from management.
  2. I, III true
  3. II, IV true
  4. All of them are true
  5. None of them are true

QUESTION 17

Which of the following statements are true?

I. Test automation tools can be used only for one project.

II. Test data comparison tool can be used to avoid human data comparison mistakes.

III. A company can utilize multiple test tools to efficiently perform their test activities.

  1. Purchasing suite of test tools from the same vendor guarantees that the tools will work together.
  2. II, III true. I, IV false
  3. I, II true. III, IV false
  4. II, III, IV true. I false
  5. I, II, IV true. III false

QUESTION 18

Select the correct pair from the following Test Tool Categories? Test Tools Category:

I. Test Management Tool

II. Web Tools

III. Keyword-Driven Test Automation Tools Features of Test Tools Categories:

a. Supports organization of test artifacts

b. Less likely to modify

c. Help to monitor SLA (service Level Agreements) compliance

  1. I-a,II-c,III-b
  2. I-b,II-a,III-c
  3. I-b,II-c,III-a
  4. I-c,II-b,III-a

QUESTION 19

What is NOT an objective of using a Test Execution Tool?

  1. Reduce effort or time related costs
  2. Run more tests
  3. Repeat tests easily
  4. Automate all new features that are going to be delivered in next release.

QUESTION 20

Company develops websites for individual users / companies. The testing team tests each build of the software once development releases it. Once testers complete the testing, they also work on coding the next build of the software. All testers and developers report to project manager. What type of independency is achieved above as per ISTQB syllabus?

  1. “No independent testers”
  2. Testing is done by a tester who is part of the development team
  3. “External Test specialists perform testing”
  4. “Testing is done by an organization external to the company”

QUESTION 21

Which of the following is NOT a challenge with outsourcing?

  1. Cultural differences
  2. Quality
  3. Employee turnover
  4. Low cost

Ngoài ra bạn có thể download nhiều tài liệu ôn thi ISTQB advanced level theo link sau: http://bit.ly/2r3puRZ

admin

4 thoughts on “Bộ đề luyện thi ISTQB Advanced level module Test Analyst- phần 1

  • Ngoc Duy

    2018-07-23 at 3:46 pm

    Chào admin
    Mình có đọc ở trên
    Ngoài ra bạn có thể download nhiều tài liệu ôn thi ISTQB advanced level theo link sau: http://bit.ly/2r3puRZ
    Admin ơi mình có request access nhưng chưa có access cho mình , admin access giúp mình với mail
    phonui196@gmail.com được k ạ.
    Mình đang cần tài liệu ôn thị cho ISTQB Advance theo module là Test Analysis
    Cảm ơn admin nhiều ạ.

    Reply
    • admin

      2018-08-21 at 11:55 am

      Đã share rồi bạn nhé

      Reply
  • thao

    2019-08-31 at 7:23 pm

    ad ơi cho em hỏi là bên mình tổ chức thi cả 3 module phải không ạ

    Reply
    • admin

      2019-09-09 at 3:36 pm

      Đúng rồi bạn nhé, bạn có thể chọn thi mỗi module 1 ngày hoặc 1 ngày 2 module, module thứ 3 thi đợt sau

      Reply

Leave a comment

Your email address will not be published. Required fields are marked *